The cost of boring a tube well 600 metres deep is as follows: 25 paise for the first metre and an additional 4 paise for every subsequent metre. Find the cost of boring 500th metre and also the total cost.
Answers
Total depth = 600 metre means n = 600
for 1st metre= 25 paise
for 2nd metre= 29 paise..... and so on
price difference between each metre = 4 means d= 4
first term a = 25
series = 25 , 29, 33, 37, .........
for n = 500
Sum = n/2 [ 2a+(n-1).d ]
500/2 [ 2×25+499×4] = 500/2[ 50+1996]
= 500×2046/2 = 511500 paise = 5115 Rs
in the same way
for n= 600
2446× 300 = 733800 paise = 7338 Rs.
Answer:
please folllow me and mark me brainilist
Total depth = 600 metre means n = 600
for 1st metre= 25 paise
for 2nd metre= 29 paise..... and so on
price difference between each metre = 4 means d= 4
first term a = 25
series = 25 , 29, 33, 37, .........
for n = 500
Sum = n/2 [ 2a+(n-1).d ]
500/2 [ 2×25+499×4] = 500/2[ 50+1996]
= 500×2046/2 = 511500 paise = 5115 Rs
so,
for n= 600
2446× 300 = 733800 paise = 7338 Rs.