The cost of leveling a square park at Rs.15 per square meter is Rs.6000. Then the side of the square is ________. *
35m
40m
75m
20m
Answers
Answered by
1
20 m is the answer
Total cost= ₹6000
Cost per square meter = ₹15
There ₹6000/₹15
= area =400m square
Therefore one side = root 400
Which is 20m
Total cost= ₹6000
Cost per square meter = ₹15
There ₹6000/₹15
= area =400m square
Therefore one side = root 400
Which is 20m
Answered by
6
Given:
• Cost of levelling per m² = Rs. 15
• Total cost of levelling the park = Rs. 6000
To calculate:
• The side of the park.
Calculation:
If cost of levelling per m² of the park is Rs. 15. So,
→ Total cost of levelling the park = Rs. 15 × Area of the park
- We are given that the total cost of levelling the park is Rs. 6000. So,
→ 6000 = 15 × Area of the park
~ Transposing 15 from R.H.S to L.H.S.
→ m² = Area of the park
~Performing division.
→ 400 m² = Area of the park
Now, calculating side of the park. We know that,
→ Area of square = (Side)²
- As we got the area of the square park previous, by substituting that value :
→ 400 m² = (Side)²
→ √(400 m²) = Side
~Finding the square root of 400 by prime factorization :
2 | 400
2 | 200
2 | 100
2 | 50
5 | 25
5 | 5
⠀| 1
⠀⇒ 400 = 2 × 2 × 2 × 2 × 5 × 5
⠀⇒ √400 = 2 × 2 × 5
⠀⇒ √400 = 20
→ 20 m = Side
Therefore, side of the park is 20 m.