The cost of painting the top surface of a triangular board at 80 paise per square meter is Rs 176.40 If the height of the board measures 24.5m , find its base
Answers
Answered by
2
Total cost-176.40.Cost/m^2=. 80.Therefore,area=176.4/0.80=220.5.Given Height =24.5.Base=220.5/24.5. Therefore base=9 m
Answered by
1
Answer:Total cost-176.40
.Cost/m^2=.80.
Therefore,area=176.4/0.80=220.5.
Given Height=24.5.
Base=220.5/24.5.
Therefore base=9 m
Step-by-step explanation:
Similar questions