the minimum possible time required to accomplish a task, assuming everything
proceeds better than is normally expected
Select one:
a. Expected time
b. Pessimistic time
c. Most likely time
d. Optimistic time.
Next pag
Answers
Answered by
0
Answer:
a. Expected time
Hope it help u