the pipe mains taking the water from the source up to the service reservoir is designed for?
Answers
Answered by
0
Explanation:
pipe design for taking water
Answered by
0
Answer:
The pipe mains taking the water from the source up to the service reservoir is designed for the fire demand plus the consistent demand of water or the maximum hourly demand of the water, whichever is maximum.
Explanation:
- The source of water is designed for maximum daily or average daily consumption.
- The pipe mains are designed for the maximum daily draft.
- Thus the servicer reservoir is designed for the fire demands, hourly fluctuations occurring in the area, and for the need for emergency Supply.