Environmental Sciences, asked by addisshumeye, 1 month ago

The proposed landfill site has a total area of 1000 m by 720 m available for cover
excavation. The average depth of excavatable cover is 1.8m. The initial rate of deposition
(IRD) for a new landfill site is 350T/day, and the waste generation area has an expected
growth rate of 3%. Calculate available airspace in m3
, annual airspace utilization in m3
:
and Landfill Site Life. Assuming that a cover to waste ratio of 1:4, a compacted density of
0.75 T/m3, and a cover to waste ratio of 1:4.

Answers

Answered by divyasunnyp
0

Answer:

Sorry I don't know this answer

Explanation:

Similar questions