Business Studies, asked by ankushamre5709, 10 months ago

The scrum team is using the kanban board what cannot be inferred from the board

Answers

Answered by gratefuljarette
20

The scrum team is using the kanban board have to work through a backlog since Kanban is less structured compared to scrum

Explanation:

  • The  Kanban board is used for optimizing the  workflow through the visualization tool which is enabled physically in an electronic  mode. Using the Kanban helps the organisation to reduce costs and the sites respond to the changes very fast
  • It does not include activities which are a waste and are not required. It works through the maximum potential of the team and is able to deliver results fast due to short cycle time
  • The cumulative flow diagram is used for monitoring the process of the Kanban board. Kanban can be used for planning the wok into projects. The breakdown charts are used for tracking the progress of a project and give a status report