Math, asked by ixstdbsecruth, 6 months ago

the side of a square piece of a land of 20m. find the cost of levelling the land at the rate of rs. 80 per square metre​

Answers

Answered by maaohm
5

area of the land = 20 × 20 m^2

= 400 m^2

cost of levelling at rs. 80 per square metre

= 400 × 80 = Rs.32000

Answered by asahilthakur
4

Answer:

Rs.32000

Step-by-step explanation:

Side of square = 20m

Area of square land = (20x20) sq.m = 400 sq.m

Cost of levelling per sq.m = Rs.80

Total cost of levelling = Rs.(80x400) = Rs.32000