Social Sciences, asked by wmureppa, 5 hours ago

The term " Maximum Allowable Post manufacturing Expenses"(MAPE) frequently seen in the news,is used in which context?​

Answers

Answered by rachel7718
15

Answer:

MAPE" (Maximum Allowable Post-manufacturing Expenses) means all costs incurred by a manufacturer from the stage of ex-factory cost to retailing and includes trade margin and margin for the manufacturer and it shall not exceed one hundred per cent for indigenously manufactured Scheduled formulations;

Answered by gayatrikumari99sl
1

Answer:

  • Maximum Allowable Post-Manufacturing Expenses, also known as MAPE, are all costs incurred by a manufacturer from the point of ex-factory cost to retailing, including trade margin and manufacturer's margin.
  • The NPPA permits MAPE at 100 percent for setting the prices of scheduled formulations produced domestically.
  • Maximum Allowable Post-Manufacturing Expenses (MAPE) equation is calculated using the Retail Price equation.
  • The government determines a formulation's retail price using the following formula.

R.P. = (1 +\frac{MAPE}{100} ) + E. D  x (M.C + C.C + P.M + P.C)

Where,

  • R. P. is the retail price.
  • M.C. stands for material cost, which covers the price of the pharmaceuticals and other pharmaceutical aids utilised, as well as any overages and process loss that may occasionally be indicated as a norm.
  • C.C. stands for conversion cost, which is calculated using defined costing techniques and fixed as a standard every year.
  • P.M. stands for "packaging material cost," which includes "process loss" and is set as a standard each year.
  • P.C. = Packing charges, calculated in accordance with standard costing procedures and set as a standard each year.

#SPJ3

Similar questions