Math, asked by bhavikatekwani, 3 months ago


There are four machines that make gears for a factory. The fastest machine can make one gear in two hours. The slowest machine makes one gear in 3 hours.
Which of the following cannot be the value of the average time taken by the four machines to make a gear?​

Answers

Answered by shruti056
0

Answer:

In a particular machine, there are 2 gears that interlock; One gear is larger in circumference than the other. The manufacturer of the gears guarantees that each gear will last for atleast 6,000,000,000 revolutions. Assuming that there is no slippage between the 2 gears and that when one gear rotates the other gear also rotates, the larger gear is guaranteed to last how many days longer than the smaller gear.

(1) The diameter of the larger gear is twice the diameter of smaller gear.

(2) The smaller gear revolves 600 times per minute.

Answered by riyabaghel678
1

Answer:

In a particular machine, there are 2 gears that interlock; One gear is larger in circumference than the other. The manufacturer of the gears guarantees that each gear will last for atleast 6,000,000,000 revolutions. Assuming that there is no slippage between the 2 gears and that when one gear rotates the other gear also rotates, the larger gear is guaranteed to last how many days longer than the smaller gear.

(1) The diameter of the larger gear is twice the diameter of smaller gear.

(2) The smaller gear revolves 600 times per minute.

F_O_L_L_O_W_____M_E

Similar questions