Science, asked by riyuu250, 6 months ago

There are three thermal generating units which can be committed to take the system load. The fuel cost data and generation operating unit data are given below: F1 = 392.7 + 5.544 P 1 + 0.001093 P 12 F2 = 217 + 5.495 P 2 + 0.001358 P 22 F3 = 65.5 + 6.695 P 3 + 0.004049 P 33 P 1 , P 2 , P 3 in MW Generation limits: 150 ≤ P 1 ≤ 600 MW; 100 ≤ P 2≤400; 50 ≤ P3≤ 200 MW There are no other constraints on system operation. Obtain an optimum unit commitment table. Adopt Brute force enumeration technique. Show the details of economic schedule and the total costs of operation for each feasible combination of units for the load level of 900.

Answers

Answered by 7cpriyakumari35976ap
0

Answer: Y6UIGUY65E5FHGIUT87TUIHYIR7J

Explanation:MARK ME BRAINLIST