There are three thermal generating units which can be committed to take the system load. The fuel cost data and generation operating unit data are given below:
F₁ = 392.7 +5.544 P₁ +0.001093 P
F₂ 217 +5.495 P₂ +0.001358 P2
F3 65.5 +6.695 P3 +0.004049 P3, P₁, P2, P3 in MW =
Generation Limits :
150 ≤ P₁ ≤600 MW
100 ≤ P₂≤400 MW
50 P3 ≤200 MW
There are no other constraints on system operation. Obtain an optimum unit commitment table. Adopt brute force enumeration technique.
Show the details of economic schedule and the component and total costs of operation for each feasible combination of units for the load level of 900 MW.
Answers
Answered by
0
Answer: This isn't an english question, is it?
Similar questions