(This is a story of a mason, who worked for a building contractor. The mason always strove to do his work to perfection. As soon as a house had been designed by the architect and details finalized by the engineer, the contractor would send for the mason and leave the responsibility of building the house to him. The mason would then, without wasting any time start his work. He would take great interest in his work of building and do it with full dedication. He made sure that he used the best construction material, of high quality, the measurement of the walls doorways arches.
Q:- Pick out 2 Compound words from the passage.
Answers
Answered by
1
Answer:
house + work = housework
Explanation:
Similar questions