Three pieces of ropes measuring 0.2km, 5005cm and 1200 mm respectively are joined end to end to form a single rope 1- how long is the new rope 2- find the cost of the rope so formed at the rate of rs 15 per meters
Answers
Answered by
1
Answer:
₹3775.5
Step-by-step explanation:
length of be rope=200m+50.5m+1.2m
=251.7m
cost=251.7*15
=₹3775.5
Similar questions