Math, asked by pawan303038pd99wb, 9 months ago

three pipes a b and c take 12 minutes 20 minutes and 15 minutes more than an hour respectively to fill a tank. all the three pipes are opened together for 12 minutes to try to fill the same tank then c is closed after another 16 minut their occurs a leakage in a and the tank is fully filled after 4 minutes in 20 seconds. what percentage of a through out is lost die to the leakage?




plzzz answer it is very urgent​

Answers

Answered by rajushe1112
1

Answer:

Pipe A = 1/15 tank per minute or 4 tanks / hour

Pipe B = 1/20 tank per minute or 3 tanks / hour

Pipe C = 1/30 tank per minute or 2 tanks / hour

So if x is the number of minutes all 3 pipes are running…

((1/15 + 1/20 + 1/30) * x) + ((1/15 + 1/20) * 6) = 1 tank

((1/15 + 1/20 + 1/30) * x) + (7/60) * 6 = 1

((1/15 + 1/20 + 1/30) * x) + .7 = 1

Pipe A + Pipe B fill the tank at a combined rate of 7 tanks per 60 minutes, so in the last 6 minutes they fill up 7/10 of the tank.

((1/15 + 1/20 + 1/30) * x) = .3

So that means that only 1 - 7/10 of the tank, or 3/10 was filled up when all 3 were running.

(1/15 + 1/20 + 1/30) * x = .3

9/60 * x = .3

With all 3 running = 9 tanks / 60 minutes

x = .3 / (9/60)

x = 2 minutes

So let’s confirm, all 3 pipes run for 2 minutes, then just A + B run for 6 minutes,

((1/15 + 1/20 + 1/30) * 2) + ((1/15 + 1/20) * 6) = 1 tank

2 minutes + 6 minutes = 8 minutes total to fill the tank

I hope this answers will help you please mark me as brainlest

Similar questions