To complete a work a and b takes 8 days, b and c takes 12 days, a,b and c takes 6 days. how much time a and c will short ticks
Answers
Answered by
5
a+b do a work in 8 days;
therefore a+b one day work = 1/8
b+c do the work in 12 days; therefore b+c one day work = 1/12
a+b+c do the work in 6 days; therefore a+b+c one day work = 1/6
From above we have a+b=1/8.............(1)
b+c=1/12.............(2)
a+b+c=1/6..................(3)
Now putting the value of a+b in equation (3), we get 1/8+c=1/6
c= 1/6-1/8=1/24; therefore c=1/24.
Putting the value of c in equation (2) we get, b+1/24=1/12
b=1/12-1/24; therefore b=1/24, now putting the value of b in equation(1) we get
a+1/24=1/8, a=1/8-1/24
therefore a=1/12
Therfore a+c=1/12+1/24 =3/24=1/8
a+c one day's work is 1/8
Therefore a+c can do the whole work in 8 days.