Physics, asked by chintufire, 6 months ago

To set a body of 2 kg in motion, the work done is 25 j. If the whole of it is used to increase the kinetic energy, then what will be the velocity acquired by the
body?​

Answers

Answered by rmchauhan175
1

Explanation:

11th

Physics

Work, Energy and Power

Work Energy Theorem

A body of mass 2 kg initial...

PHYSICS

avatar

Asked on November 22, 2019 by

Litu Tadhani

A body of mass 2 kg initially at rest moves under the action of an applied horizontal force of 7 N on a table with coefficient of kinetic friction = 0.1. Compute the

(a) work done by the applied force in 10 s.

(b) work done by friction in 10 s,

(c) work done by the net force on the body in 10 s,

(d) change in kinetic energy of the body in 10 s,

and interpret your results.

MEDIUM

Share

Study later

VIDEO EXPLANATION

ANSWER

Given:

The mass of the body is m=2kg

The force applied on the body F=7N

The coefficient of kinetic friction =0.1

Since the body starts from rest, the initial velocity of body is zero.

Time at which the work is to be determined is t=10s

The acceleration produced in the body by the applied force is given by Newtons second law of motion as:

a

=

m

F

=

2

7

=3.5m/s

2

Frictional force is given as:

f=μg=0.1×2×9.8=1.96

The acceleration produced by the frictional force:

a"=−

2

1.96

=−0.98m/s

2

Therefore, the total acceleration of the body:

a

+a"=3.5+(−0.98)=2.52m/s

2

The distance traveled by the body is given by the equation of motion:

s=ut+

2

1

at

2

=0+

2

1

×2.52×(10)

2

=126 m

(a) Work done by the applied force,

W

a

=F⋅s=7×126=882 J

(b) Work done by the frictional force,

W

f

=F⋅s=1.96×126=247 J

(c), (d)

From the first equation of motion, final velocity can be calculated as:

v=u+at

=0+2.52×10=25.2m/s

So, the change in kinetic energy is

ΔK=

2

1

mv

2

2

1

mu

2

=

2

1

2(v

2

−u

2

)=(25.2)

2

−0

2

=635 J

The distance traveled by the body is given by the equation of motion:

s=ut+

2

1

at

2

=0+

2

1

×2.52×(10)

2

=126 m

Net force =7+(1.96)=5.04 N

Work done by the net force,

W

net

=5.04×126=635 J

Similar questions