Business Studies, asked by sonams98, 3 months ago

Tracking project performance with respect to technical requirements is referred to as ?

(A) Change control

(B) Product control

(C) Quality control

(D) Quality check​

Answers

Answered by pradha2009
2

Answer:

I think the answer is quality control

Answered by shamsazeeshan
1

Answer:

(C) Quality control

Explanation:

HOPE ITS HELp