Two bridges have to be build of length 1024 m and 960 m respectively. The largest length of concrete beams that is required to built the both bridges as the combination of beams exactly fit for the required lengths, is
A) 12 m
B)
16 m
C)
32 m
D 64 m
Answers
Answered by
2
Answer:
HCF of (1024,960)=64
Step-by-step explanation:
Similar questions