English, asked by kirandahivalkar143, 6 months ago

Under Process Costing, the concept of process cost is based on​

Answers

Answered by Nathalie14
0

Answer:

Process Costing Overview

In other words, the cost of each product produced is assumed to be the same as the cost of every other product.

Under this concept, costs are accumulated over a fixed period of time, summarized, and then allocated to all of the units produced during that period of time on a consistent basis.

Similar questions