Vivian's manager has asked her to analyze the project requirements before finalizzing them. What should she look for and address during her analysis
Answers
Answered by
1
Answer:
In simple words, while analyzing for the requirements Vivian should take into consideration the present as well as future requirements that may arise. However the length of the analysis should be of reasonable size. The requirements of the relevant stakeholders should only be considered.
If the list is made too short than it may result in future problems of resources also the list should be made on a consistent nature.