Business Studies, asked by sonunaik24, 5 hours ago

what are the 4 ascpest work study devleoped by talyor explain?​

Answers

Answered by aryaramakrishnan
14

Standardisation and simplification of work: Standardisation refers to the process of setting standards for every business activity. These standards are the benchmarks, which must be adhered to during production.

This can be done by following scientific methods of production and through work-study techniques which include time study, motion study, etc. Standardisation relates to process, raw – material, time, product, machinery, methods or working conditions.

  1. Method study: The objective of method study is to find out one best way of doing the job.
  2. Work-study: It refers to the study of movements like lifting, putting objects, sitting and changing positions, etc, which are undertaken while doing any job.
  3. Time – study: It determines the standard time taken to perform a well-defined job.
  4. Fatigue study: It determines the amount and frequency of rest intervals in completing a task.

Similar questions