what are the feasibility studies for requirements engineering process?
Answers
Answered by
2
The first step in the Requirement engineering process is the feasibility study. The Feasibility study is based mainly on the necessity of the proposed system in the organization and the domain information of the system.
Answered by
0
Answer:
engineering is very nice
Explanation:
please follow me I will give you so much thanks only follow me
Similar questions