What factor should be considered in selecting a base to be used in computing predetermined overhead rate
Answers
Answered by
0
Answer:
What factor should be considered in selecting a base to be used in computing predetermined overhead rate
Answered by
0
Answer:
What elements are involved in computing a predetermined overhead rate? The estimated annual overhead costs and an expected activity base such as direct labor hours. The rate is computed by dividing the estimated annual overhead costs by the expected annual operating activity.
Similar questions