Accountancy, asked by anjalikushwaha5050, 4 months ago

what is reordering?
under what circumstances would you recommend revision of level?​

Answers

Answered by komalkajal950
0

Answer:

If you are considering outsourcing elements of your manufacturing operation, or already working with a Contract Electronics Manufacturer (CEM), it’s important you keep control of one crucial element – your documentation.

This is particularly necessary if printed circuit board assemblies (PCBA) are being manufactured as stand-alone products in their own right, especially if you are looking for a CEM to integrate these PCBAs into a full system or box build assembly.

In short, you need to ensure your manufacturing data is tightly controlled at every level. Failure to do so can result in a variety of issues, the worst possible outcome being product built to an older revision level which you can’t then use. l

Answered by prabhayadavmishki198
2

Explanation:

reordering - a rearrangement in a different order. rearrangement - changing an arrangement. permutation - act of changing the lineal order of objects in a group. transposition, reversal - the act of reversing the order or place of

re·or·der (rē-ôr′dər)

v. re·or·dered, re·or·der·ing, re·or·ders

v.tr.

1. To order (the same goods) again.

2. To straighten out or put in order again.

3. To rearrange.

Similar questions