What is the answer ?
Attachments:

Answers
Answered by
1
Answer :
3.45 m
Step-by-step explanation:
Length of the cut off rope = 19/5m = 3.8 m
Length of total rope = 29/4 m = 7.25 m
Length of the remaining rope = 7.25 - 3.80
= 3.45 m
Similar questions