What is the expected production of hydroelectricity by the end of 14th plan in nepal?​

Answers

Answered by Disha094
3

. Mitigation and adaptation. Nepal has planned to produce 12,000 MW clean energy by 2030 including 4000 MW hydroelectricity by 2020, 2100 MW solar energy, 220 MW bioenergy by 2030, and 50 MW of electricity from small and micro-hydropower plants.

Answered by EnchantedRahuL
0

\huge{\tt{\red{}\green{A}\purple{N}\pink{S}\blue{W}\orange{E}\red{R}}}༻

  • Nepal has planned to produce 12,000 MW clean energy by 2030 including 4000 MW hydroelectricity by 2020, 2100 MW solar energy, 220 MW bioenergy by 2030, and 50 MW of electricity from small and micro-hydropower plants.