Math, asked by ktrr0998, 1 year ago

what is the expenditure to prepare a closed cuboidal tank of metal sheet of dimension 4m×3m×2m if the rate of metal sheet is 150 rupees per metre square​

Answers

Answered by Anonymous
11

Answer:

Total surface area of cuboid = 2(lb+bh+hl)

= 2(4x3+3x2+2x4)

= 2 (12+6+8)

=2 (26)

=52m^2

Therefore total expenditure = 52x150 = rupess7800.

Answered by sonawalemarvaj
2

Answer:

₹7800

Step-by-step explanation:

Formula =

2(4×3+3×2+4×2)

2(26)

=52

Therefore , 150 × 52

= 7800

Ans = 7800