what is the work done by Nishad of his speed changes from 5km/hr to 10km/hr?Nishad's mass is 35kg....
Answers
Answer:
Step-by-step explanation:
M=35kg,
U=5km/h = 25/18m/s
V=10km/h = 50/18m/s
Work done=change in K. E
K.E=1/2mv^2
=1/2×35×(50/18)^2
=1/2×35×2500/324
=87500/648
= 135.03J
K.E=1/2mv^2
=1/2×35×(25/18)^2
=1/2×35×625/324
=21875/648
=33.75J
135-33=102J
Hence work done= 102J
Answer:
102 Joules
Step-by-step explanation:
GIVEN :
- M=35kg,
- U=5km/h = 25/18m/s
- V=10km/h = 50/18m/s
We know that,
Work done (w)=change in Kinetic Energy (K.E.)
So,
Initial K.E=1/2mu^2
=1/2×35×(50/18)^2
=1/2×35×2500/324
=87500/648
= 135.03J
Final K.E=1/2mv^2
=1/2×35×(25/18)^2
=1/2×35×625/324
=21875/648
=33.75 J
Now, work done :
Initial K.E. - Final K.E.
135 - 33 =102J
So, the work done by Nishad on bicycle= 102J