Important Time and Work Formula
Work Done = Time Taken × Rate of Work. Rate of Work = 1 / Time Taken. Time Taken = 1 / Rate of Work. If a piece of work is done in x number of days, then the work done in one day = 1/x.
Answered by
0
Answer:
Important Time and Work Formula
Work Done = Time Taken × Rate of Work. Rate of Work = 1 / Time Taken. Time Taken = 1 / Rate of Work. If a piece of work is done in x number of days, then the work done in one day = 1/x.