Answer:

Important Time and Work Formula

Work Done = Time Taken × Rate of Work. Rate of Work = 1 / Time Taken. Time Taken = 1 / Rate of Work. If a piece of work is done in x number of days, then the work done in one day = 1/x.

Answered by chetansji
0

Answer:

Important Time and Work Formula

Work Done = Time Taken × Rate of Work. Rate of Work = 1 / Time Taken. Time Taken = 1 / Rate of Work. If a piece of work is done in x number of days, then the work done in one day = 1/x.

Step-by-step explanation:

plz mark me as brainliest