what two things should be completed before moving on to the next iteration planning begins?
Answers
The answers are iteration demo and retrospective.
Two things that should be completed before moving on to the next iteration planning begins are iteration demo and retrospective.
An iteration refers to the repetition of a process. The result of a previous mathematical procedure is applied to the computation of the present step. In other words, the result of one iteration is used at the beginning of the following iteration.
Iteration is the process of repeating the same process in order to get the desired sequence of outcomes and then the desired goal.
Before moving to the next iteration planning, the two things that should be completed are:
• An iteration demo and a retrospective.
• An iteration demo and retrospective which help in closing the whole process.