The first hydropower project in Nepal was commissioned on 22nd May 1911 (inaugurated by late King Prithvi Bir Bikram Shah) in Pharping, about 10 km south of Kathmandu, using water from two spring sources, Satmule and Shikha Narayan3, with installed capacity of 500 kW
Answered by
4
Answer:
correct answer friend
The first hydropower project in Nepal was commissioned on 22nd May 1911 (inaugurated by late King Prithvi Bir Bikram Shah) in Pharping, about 10 km south of Kathmandu, using water from two spring sources, Satmule and Shikha Narayan3, with installed capacity of 500 kW.