Computer Science, asked by shubhangisingh2310, 21 hours ago

Which of the following two are category of estimation mode?
1. High level
of
2. Low Level
3. Refined.
4. Detailed

Answers

Answered by brokendreams
10

(4)."Detailed" is the category of estimate model, The model after transforming the data distribution into an approximation normal.

Detailed category of estimate Model:

  • Outliers and skewed distributions of time estimations are common in molecular clock investigations.
  • In some situations, the model outperforms the mean or median in estimating the overall time of divergence.
  • The Standard Parametric Mode (SPM) and the Robust Parametric Model are two very distinct techniques (RPM).
  • These methods employ the probability density function of the approximated distribution to estimate.
  • However, with tighter project budgets and timetables, as well as the high expense of construction litigation, there is more monitoring.
  • Parties preparing schedule delay claims or requests for extensions of time should pay close attention to industry standards and peer validation of approved procedures.
Answered by sourasghotekar123
2

Answer:

The correct answer is option 4. Detailed

Explanation:

  • An estimation mode for any project work may be defined as the process of analyzing the quantities and costs of the different items required in connection with the work.
  • Before starting any project, the owner of the project should have a thorough knowledge of the every thing related to work.
  • The four category of estimation mode are:
  1. Preliminary Estimate
  2. Detailed Estimate
  3. Quantity Estimate
  4. Bid Estimate

Hence the correct answer is option 4. Detailed

#SPJ2