which of the following which of the following is not a requirement for site selection of hydroelectric power plant first availability of water second large catchment area third Rock hill and forth sedimentation
Answers
Answered by
0
Answer:
Hydropower plants can supply large amounts of electricity, and they are relatively easy to adjust for demand by controlling the flow of water ...
Explanation:
Answered by
0
Sedimentation is not a requirement for site selection of hydroelectric power plant.
Explanation:
- Sedimentation may reduce the water storage capacity of reservoir and may also cause damage to the turbine blades.
- Availability of water, large catchment area and rocky land are the primary requirements for site selection of hydroelectric power plant.
- Site selection and factors affecting the location of dam of hydroelectric power plants are storage of water, cost and type of land, transportation facilities, constituents of a hydro-electric plant, hydraulic structure and a schematic arrangement of hydro-electric power station and its operation.
- The principle of hydropower plant is that the potential energy is converted into kinetic energy.
- Because the water stored at great heights in the dam so its allowing the water to flow at high speed.
- Then the kinetic energy of flowing water used to generate electricity.
To Learn More...
1.Advantages and disadvantages of hydroelectric power plant?
https://brainly.in/question/5861502
2.Write the energy conversion that takes place in a hydropower plant
https://brainly.in/question/2962565