Which of the following would be the next best option for the construction of a geothermal power plant of
the site contains no volcanoes?
A. Fault lines
B. Mid-ocean ridge
C. Subduction zones
D. trenches
Answers
Answered by
1
Answer:
Explanation:
trenches as very low possibility of volcanoes
Answered by
1
Answer:
Option C
Explanation:
Subduction zones