Which one of the following is not a step of requirement engineering:
(a) Elastration
(b) Design
(c) Analysis
(d) Documentation​

Answers

Answered by thehardikpatel
1

\huge\underline\purple{\sf Answer}

a) ELASTRATION

b) DESIGN

c) ANALYSIS

d) DOCUMENTATION

Answered by Jasleen0599
0

Option b) Design

  • The four essential process steps of requirement engineering are requirement elicitation, requirement analysis, requirement documentation, and requirement review. Design is a distinct stage of software engineering in and of itself.
  • Throughout the engineering design process, the design requirements govern the design of the product or process being created. These comprise fundamental elements such as the functions, features, and requirements, which are chosen after analyzing user demands.
  • Design requirements are the specifications and design criteria from the Contract that outline the minimum acceptable technical requirements and establish the parameters in which the Project's design must be developed and carried out.

#SPJ3