Which one of the following statements about a change model is CORRECT?
1. A change model defines the steps that should be taken to handle a particular type of change
2. A change model should NOT be used for emergency changes
3. Escalation procedures are outside the scope of a change model
4. A change model should be constructed when a significant change is required

Answers

Answered by rajivk7980
26

Answer:

I think that the first option is correct

Answered by Tulsi4890
6

The correct statement is 3. Escalation procedures are outside the scope of a change model.

  • A change model consists of all of the steps that need to be taken to control an important situation.
  • The model teaches us how to stay calm and accept the change going on around us.
  • Once we accept the change, the mind starts thinking about the solution to manage the circumstances.  
  • The Change model may be used for emergency modifications.
  • It will not be created routinely when significant changes are made.
  • Escalation strategies may be blanketed in a change model.