Which one of the following statements about a change model is CORRECT?
1. A change model defines the steps that should be taken to handle a particular type of change
2. A change model should NOT be used for emergency changes
3. Escalation procedures are outside the scope of a change model
4. A change model should be constructed when a significant change is required
Answers
Answered by
26
Answer:
I think that the first option is correct
Answered by
6
The correct statement is 3. Escalation procedures are outside the scope of a change model.
- A change model consists of all of the steps that need to be taken to control an important situation.
- The model teaches us how to stay calm and accept the change going on around us.
- Once we accept the change, the mind starts thinking about the solution to manage the circumstances.
- The Change model may be used for emergency modifications.
- It will not be created routinely when significant changes are made.
- Escalation strategies may be blanketed in a change model.