point Which phase in the IC supply chain is considered trusted? Wafer probe Packaging Deploy and monitor Specification Design 

12. Which of the following is NOT a payload of hardware Trojan? Change IC's functionality Reduce circuit reliability Leak senstive information Remove IC designer's watermark point 13. Which of the following hardware Trojan detection methods CANNOT catch non-functional Trojans? Run-time monitoring mechanisms Logic test based approaches Side channel analysis based methods point 14. Which of the following approaches is a pre-synthesis hardware Trojan prevention method? Removal of dead space Test and validation Formal verification Interface protection Shielding wires