Which phase of the waterfall model requires maximum effort?

Answers

Answered by Anonymous
14
Hey !


_____________________________________________

testing phase
--------


The testing phase consumes the maximum effort in waterfall model.



Answered by smartbrainz
3

The answer is the Construction Phase.

Explanation:

The waterfall model is a sequential method in the "software development life cycle" (SDLC) which is most famous in software product development.

The waterfall model groups software development into different stages which assert a logical advancement of steps.

"The waterfall model" is a sequential method in which advancement is noticed as flowing like a waterfall constantly downwards through the stages of Conception, Initiation, Analysis, Design, Development/Construction, Testing, Implementation, and Maintenance.