Which phase of the waterfall model requires maximum effort?
Answers
Answered by
14
Hey !
_____________________________________________
testing phase
--------
The testing phase consumes the maximum effort in waterfall model.
_____________________________________________
testing phase
--------
The testing phase consumes the maximum effort in waterfall model.
Answered by
3
The answer is the Construction Phase.
Explanation:
The waterfall model is a sequential method in the "software development life cycle" (SDLC) which is most famous in software product development.
The waterfall model groups software development into different stages which assert a logical advancement of steps.
"The waterfall model" is a sequential method in which advancement is noticed as flowing like a waterfall constantly downwards through the stages of Conception, Initiation, Analysis, Design, Development/Construction, Testing, Implementation, and Maintenance.