While fixing a ship by two bearings of a single object, with a time interval between observations, the point of intersection of the transferred position line and the _______ position line is the ship’s position at the time of _______observation answer me
Answers
Answered by
5
While fixing a ship by two bearings of a single object, with a time interval between observations, the point of intersection of the transferred position line and the _______ position line is the ship’s position at the time of _______observation answer me
Answered by
3
You are given conducting wires, a cell, a key, a resistor and two different types of metres
labelled A and V. You are required to measure the current in the wire and the potential
difference across the resistor. Draw a labelled circuit diagram using appropriate symbols
to show how they are connected. Also mark the direction of current in each component.
Attachments:
Similar questions