Computer Science, asked by suhendhar, 1 year ago

windows 98 scheduling type​

Answers

Answered by yagneshravaliya2004
0

Answer:

In computing, scheduling is the method by which work is assigned to resources that complete the work. The work may be virtual computation elements such as threads, processes or data flows, which are in turn scheduled onto hardware resources such as processors, network links or expansion cards.

A scheduler is what carries out the scheduling activity. Schedulers are often implemented so they keep all computer resources busy (as in load balancing), allow multiple users to share system resources effectively, or to achieve a target quality of service. Scheduling is fundamental to computation itself, and an intrinsic part of the execution model of a computer system; the concept of scheduling makes it possible to have computer multitasking with a single central processing unit (CPU).

Answered by anoopmonsttter
0

Explanation:

Windows 98 (codenamed Memphis)[3] is a graphical operating system developed by Microsoft as part of its Windows 9x family of operating systems. It is the successor to Windows 95, and was released to manufacturing on May 15, 1998, and to retail on June 25, 1998. Like its predecessor, Windows 98 is a hybrid 16-bit and 32-bit[4] monolithic product with the boot stage based on MS-DOS.[5]

Similar questions