English, asked by mineshg468, 1 day ago

Write a report at least 250 to 300 words about of Jewar International Airport​

Answers

Answered by 8a10kavyadixit
1

Answer:

Noida International Airport, also known as Jewar Airport and officially Noida International Greenfield Airport,[2][3][4] is an under-construction international airport being constructed near the town of Jewar in Gautam Buddh Nagar, Uttar Pradesh.[5] Once completed, it’s planned to be the country's largest airport.The Yamuna Expressway Industrial Development Authority (YEIDA) will be the implementing agency on behalf of the government of Uttar Pradesh. The airport is to be developed through a public-private partnership model (PPP).[6] The proposed plan is to build a two runway airport by 2024, and at a future date, to expand it into a 7,200 acres (2,900 ha) six-runway airport.[7] According to the proposed plan, the airport will handle five million passengers per annum (MPA) initially and up to 60 MPA to 120 MPA, after its expansion over a period of 30 years.[8]

The project site is located 72 kilometres (45 mi) from Indira Gandhi International Airport, the airport that currently serves the needs of the entire National Capital Region and is quickly reaching its peak capacity;[9] 36 km (22 mi) from Bulandshahr, 60 km (37 mi) from Noida and 70 km (43 mi) from Faridabad,Ghaziabad and Mathura, about 48 km (30 mi) from Greater Noida, 65 km (40 mi) from Aligarh, 65 km (40 mi) from Gurgaon and 130 km (81 mi) from Agra. It will be connected to the Yamuna Expressway, allowing domestic and international tourists to reach Agra, Mathura and Vrindavan.[10]

Prime Minister Narendra Modi laid the foundation stone of Jewar Airport on 25 November 2021.[11] YEIDA has identified 5,100 ha (13,000 acres) for the project, out of which 240 ha (590 acres) belongs to the state government and the rest is owned by private entities. YEIDA will acquire 1,327 ha (3,280 acres) in the first phase for the construction of terminal buildings and runways.[10] Bids for the airport are expected to be invited by the end of 2019.[12] It will be the third commercial airport in Delhi-NCR after Indira Gandhi International Airport and a regional airport at Hindon.

It is proposed to be connected to Noida Metro via Greater Noida route; and the Delhi Metro via the Faridabad–Ballabhgarh–Palwal–Jewar route,[13][14] and proposed to be connected with driverless pod taxis or personal rapid transit (PRT) from amusement park included in the proposed film city project, located in Greater Noida's Sector 21 to the airport.[15] It is also proposed that the airport will have a high-speed railway (HSR) station in the proposed Delhi-Varanasi-Kolkata HSR line, included in India's High-Speed Rail project.[16]

Explanation:

PLS MARK ME AS BRAINLIST

Answered by thejaswigowdahm
0

Answer:

why does the poet think that he is blessed

Similar questions