write an essay in about 250 words on SPEEDING UP INDIA'S JOURNEY BY BULLET TRAIN?
Answers
Answered by
40
Hey there !!
____________________
Here's your essay on "SPEEDING UP INDIA’S JOURNEY BY BULLET TRAINS"
High speed in Indian Railways is at present limited to 150 KMPH. However, in many other countries the speed of Railways is of the order of 200 KMPH. In France, Japan, Germany, China, Spain and South Korea high speed traction above 280 KMPH has been introduced. India and Japan have signed a memorandum of understanding (MoU) on 12th December, 2015 on cooperation and assistance in the Mumbai-Ahmedabad High Speed Rail (HSR) Project referred to many as “Bullet Train Project”. Japan has offered an assistance of over Rs. 79,000 crore for the project. The loan is for a period of 50 years with moratorium of 15 years, at an interest rate of 0.1 per cent.
The project is 508-kilometre Railway line costing a total of Rs. 97,636 crore, to be implemented in a period of seven years. It has been agreed that for the Mumbai-Ahmedabad HSR Project. Japan’s Shinkasen Technology, known for its speeds reliability and safety, will be adopted. Transfer of technology and “Make in India” will be essential part of this assistance package. Japan will also assist India in training of personnel for HSR. The two countries have also entered into two comprehensive technological cooperation agreements on 11th December, 2015 for modernization and up gradation of Indian Railways. These agreements have been signed during the official visit to India of His Excellency Mr.Shinzo Abe, the Prime Minister of Japan, during December 11-13, 2015.
____________________
Hope my ans.’s satisfactory. (^-^)
____________________
Here's your essay on "SPEEDING UP INDIA’S JOURNEY BY BULLET TRAINS"
High speed in Indian Railways is at present limited to 150 KMPH. However, in many other countries the speed of Railways is of the order of 200 KMPH. In France, Japan, Germany, China, Spain and South Korea high speed traction above 280 KMPH has been introduced. India and Japan have signed a memorandum of understanding (MoU) on 12th December, 2015 on cooperation and assistance in the Mumbai-Ahmedabad High Speed Rail (HSR) Project referred to many as “Bullet Train Project”. Japan has offered an assistance of over Rs. 79,000 crore for the project. The loan is for a period of 50 years with moratorium of 15 years, at an interest rate of 0.1 per cent.
The project is 508-kilometre Railway line costing a total of Rs. 97,636 crore, to be implemented in a period of seven years. It has been agreed that for the Mumbai-Ahmedabad HSR Project. Japan’s Shinkasen Technology, known for its speeds reliability and safety, will be adopted. Transfer of technology and “Make in India” will be essential part of this assistance package. Japan will also assist India in training of personnel for HSR. The two countries have also entered into two comprehensive technological cooperation agreements on 11th December, 2015 for modernization and up gradation of Indian Railways. These agreements have been signed during the official visit to India of His Excellency Mr.Shinzo Abe, the Prime Minister of Japan, during December 11-13, 2015.
____________________
Hope my ans.’s satisfactory. (^-^)
Answered by
7
as India learnt Technology the production cost to various projects came down quite quickly we could send objects to Mars cheaper than the production cost of a Bollywood movie the same could happen in bullet trains even if we import the text from Japan now 20 years from now India could learn enough to become a major innovator in this sector the relation between Japan and India Japan and India have huge potential to collaborate and this deal could kick start the process
for now the tickets will be costlier than air tickets but then will also come at better speed and confirm if we consider the recent Mumbai Ahmedabad bullet train project in the time it takes to reach the Mumbai Airport from South Mumbai and speed almost and her getting through all the checks and board a Traveller on the bullet train will already be in the Ahmedabad time saver every her we could cut in an entrepreneurs transportation time the nation could benefit immensely in a direct way business will flourish eventually the signing of the bullet train agreement between India and Japan has generated rancorous debate in the media and Lon social media the question being asked most is does India need a bullet train or is in India even ready for 1 according to the agreement Japan will provide 12 bilion to build India's first bullet train between Mumbai and Ahmedabad the highly consensual Loan at an interest rate of 0.1% to be repaid over 50 years will have a Moratorium for 15 years meanwhile China is conducting feasibility studies for high speed link between New Delhi and Chennai China has offered a long term loan to between as deeply as Japan
for now the tickets will be costlier than air tickets but then will also come at better speed and confirm if we consider the recent Mumbai Ahmedabad bullet train project in the time it takes to reach the Mumbai Airport from South Mumbai and speed almost and her getting through all the checks and board a Traveller on the bullet train will already be in the Ahmedabad time saver every her we could cut in an entrepreneurs transportation time the nation could benefit immensely in a direct way business will flourish eventually the signing of the bullet train agreement between India and Japan has generated rancorous debate in the media and Lon social media the question being asked most is does India need a bullet train or is in India even ready for 1 according to the agreement Japan will provide 12 bilion to build India's first bullet train between Mumbai and Ahmedabad the highly consensual Loan at an interest rate of 0.1% to be repaid over 50 years will have a Moratorium for 15 years meanwhile China is conducting feasibility studies for high speed link between New Delhi and Chennai China has offered a long term loan to between as deeply as Japan