Accountancy, asked by aiman678, 15 days ago

You work in a manufacturing organization Consider an equipment that is available for production
for 18 hours per day. On a regular day. 350 items are processed through this equipment, each of
which takes around 25 minutes on it. Total time required for setting up the equipment is 1.5
minute, 1 minute is required to obtain the final product Out of the items that are processed through
the equipment, 20% requires rework and needs to undergo the sel-up and processing time once
again In rest of the time, the equipment remains idle. What is the total waste time in minutes?
(A) 30
(B) 175
(C) 630
D) 205​

Answers

Answered by shivamgupta6228
0

303030303p303p3030202030303033o3o393393939339484o4499449

Answered by shaiqjeelani
1

Answer:

A) 30

Explanation:

18 hours = 1080 mins

((350 + 20% = 70) = 420)*2.5 = 1050 mins

Waste = 30 mins.