10 men can plough a field in 7 day . In how manun day can 14men plough that field.

Answers

Answered by akhil5333
2

Number of men changed n times.

10 n = 14 .

n = 14/10.

Time will change by 1/n times.

1/n = 10/14

10/14 of 7 is 5 .

The days are reduced to 5 days, as men are increased from 10 