4 men and 6 boys can finish a work in 5 days while 3men and 4boys can finish it in 7 days. find the time taken by 1 men and 1 boy alone
Answers
Answered by
13
4M + 6B = 5D
3M + 4B = 7D
Find the ratio of boys to men:
(4 x 5)M + (6 x 5)B = (3 x 7)M + (4 x 7)B
20M + 30B = 21M + 28B
30B - 28B = 21M - 20M
2B = 1M
Find the number of days 1 boy take to do the job:
4M + 6B = 5D
4(2B) + 6B = 5D
8B + 6B = 5D
14B = 5D
1B = 5 x 14 = 70 days
Find the amount of work 1 boy can do in a day:
1 Boy takes 70 days to do the work
⇒ 1 day = 1/70 of the work
Find the amount of work one man can do in a day:
1M = 2B
1 boy = 1/70 of the work
1 man = 1/70 x 2 = 1/35 of the work
Find the number of days needed:
1 boy = 1/70 of the work
1 man = 1/35 of the work
1 boy + 1 man = 3/70 of the work
3/70 of the work = 1 day
1/70 of the work = 1/3
70/70 of the work = 1/3 x 70 = 23 1/3 days
Answer: 1 man and 1 boy will need 23 1/3 days to finish the work