Business Studies, asked by jitufact, 1 day ago

41. During initial testing of hydrant system, an inspection of the system should be done to check that no leakage of water is taking place at any of the joints or landing valves and the pressure in the system does not drop more than (A) 30 kPa (B) 50 kPa (C) 60 kPa (D) 80 kPa .​

Answers

Answered by Omarandkar
0

Answer:

During initial testing of hydrant system, an inspection of the system should be done to check that no leakage of water is taking place at any of the joints or landing valves and the pressure in the system does not drop more than 60 Kpa (c)

Similar questions