மேற்செலலகள் 5.000 10.000 16. With the following data for 60% activity, prepare a budget for 80% activity Ra] Materials 10 per unit Wages 6 Factory overheads 6.000 (20%ixed) Administration overheads 2,100(10% variable) Assume the production at 60% activity is 240 units.
Answers
Answered by
8
Answer:
Refer to the attachment
Hope it helps you
Attachments:
Answered by
0
Answer:
thx for the fr33 p01ntz btw answer is 12 hope it helpz
Similar questions