Kaleshwaram: World's Largest Lift Irrigation Project

Total length: 1531 kms.

Total tunnel length: 203 km (World's largest tunnel route)

Pressure pipe line: 98 km.

Total number of lifts: 20.

Total number of pump houses: 22.

In the Kaleshwaram lift irrigation project, the pump of 139 MW maximum capacity has been utilized, which has not yet been utilized in the world.

Answered by hamsa2662
0

Answer:

About kaleswaram

Claimed to be an engineering marvel, the project comprises 1,832 km water supply route, 1,531 km gravity canal, 203 km tunnel routes, 20 lifts, 19 pump houses and 19 reservoirs with a storage capacity of 141 TMCs. 6. It requires nearly 4,992 MW of electricity to pump 2 TMC of water every day in the first phase.