Math, asked by hariharanbhagyashee, 4 months ago

50 cm fabric in 1 hour. Find the total length of fabric produced in the factory in
1 hour.
1. Karthik owns a small power loom factory with two machines. The first machine
produces 41 m 66 cm fabric in 1 hour and the second machine produces 27 m​

Answers

Answered by venkateswarao28
0

Answer:

the total length of fabric produced in the factory in 1 hour=68m16cm

Similar questions